Wednesday, 28 December 2011
Other success stories of the piezoelectric carpet
1. http://www.greenbiz.com/news/2009/06/15/sainsburys-rolls-out-kinetic-energy-generator
2. http://inhabitat.com/tokyo-subway-stations-get-piezoelectric-floors/
3. http://www.ecofriend.com/entry/future-perfect-piezoelectricity-rising-as-a-panacea-for-energy-crisis/
4. http://www.ecofriend.com/piezoelectric-generators-power-future.html
2. http://inhabitat.com/tokyo-subway-stations-get-piezoelectric-floors/
3. http://www.ecofriend.com/entry/future-perfect-piezoelectricity-rising-as-a-panacea-for-energy-crisis/
4. http://www.ecofriend.com/piezoelectric-generators-power-future.html
Project Closing
- Final evaluation for the whole system, data collection regarding reduction in the electricity consumption
- Study customer feedback and seek for improvement
- Expand to all others mrt station
- Expand to shopping center and airport
Risk Analysis
Risks that may encounter :
1. Short circuit
2. Unrealiable supplier
3. Lack of expertise
4. Limited time frame
1. Short circuit
2. Unrealiable supplier
3. Lack of expertise
4. Limited time frame
Return of Investment
Investment cost = SGD 45,000
Eletricity cost reduction per months = SGD 2,000
Assume the piezoelectric carpet last for 5 years, and maintenance cost for 5 year is SGD 12,000
hence, the total saving is SGD 120,000- 12000 = 108,000
ROI = (108000-45000)/45000 =140%
Payback period = 25 months
Eletricity cost reduction per months = SGD 2,000
Assume the piezoelectric carpet last for 5 years, and maintenance cost for 5 year is SGD 12,000
hence, the total saving is SGD 120,000- 12000 = 108,000
ROI = (108000-45000)/45000 =140%
Payback period = 25 months
Tuesday, 27 December 2011
AON
A : Assign Team
B : Project Planning
C : Fabrication
D : Installation
E : Final Phase
F : Improvement
B : Project Planning
C : Fabrication
D : Installation
E : Final Phase
F : Improvement
Scope
Location : S* and O* P* mrt station
Duration: 2 months
Cost : SGD 37k
Responsibility : Project Manager, Electrical Engineers and techician
Manpower : 20 workers
Resources : sub-con for piezoelectric device, carpet, wiring equipment
Duration: 2 months
Cost : SGD 37k
Responsibility : Project Manager, Electrical Engineers and techician
Manpower : 20 workers
Resources : sub-con for piezoelectric device, carpet, wiring equipment
Objective
Reduce the electric consumption in MRT station by installion the piezoelectric carpet.
Piezoelectric carpet will be installed in S* and O* P* mrt station.
Piezoelectric carpet will be installed in S* and O* P* mrt station.